Tag Archive | Diamond

Still weaving…

Yes, I added  on but found that this method of assembly really does take  up a lot. It was barely enough but I decided to add a little more ease, just in case. Once cut you are committed and I can take up easier than let out on this project! So It will be another day before I cut.

Meantime the boobie prize for the Bunko was a hit last night.  It ended in a 4 way tie for most losses so they rolled off. The winner seemed happy with her prize. I wove the napkin on the 14″ square and crocheted the edging to make it a bit fancier. The yarn is some nice acrylic in bright colors. I added a loaf of frosted cinnamon raisin bread. It was supposed to go into a bamboo bread basket but the basket proved too small for my husky loaf. Ah well..

And today it’s snowing. Again…

 

The Diamond Skirt project.

Well, I am getting this thing together but I have to admit it is not turning out quite like I pictured in my mind. I pinned it on Madelyn this morning just to check what was happening as it is difficult to tell what I have when it is wadded up in my lap. Even keeping in mind that it has not been blocked I’m not sure the assembly is working smoothly. I may have to redo some of these seams. But the biggy to my mind is the total shape. I had pictured a petal skirt, like one a friend was wearing the other day. I know that on Maddy, it just hangs and does not have the kind of swirly effect it has when you are moving, but I’m not sure it is working. Also it seems to me to be either too long or not long enough. I did a composite sketch showing it shortened. With the diamonds in the same arrangement, the short skirt forms gentle pleats. I would love some feedback, especially from those of you who actually wear skirts.

DSCN1490[1] xx short

New projects

I have three going just now, but the lace has been put at the bottom of the list and will be there probably though September. Can’t decode on a pattern that will work for what I have in mind.

bows ft

The Shawl In A Ball yarn on the 4” is still a WIP but only getting occasional attention this week.

DSCN1434[1]

But I have moved my planned project up to top of the list and it is getting woven a lot faster than I thought it would be. I’d like to get it done before OFFF if I can. And just as a little added interest, to myself if no one else, I am timing it. The Tiny diamonds are taking me 7 minutes each, the 7” take 20 minutes and I wove the 14” in 55 minutes. So I have this far: 35×7+ 4hr 9min. 10×20=3hr. 33min. Plus 1×55+55min. So I have 9 hours and 62 minutes of weaving time in this so far, if my math is correct. As this weaving is done while listening to the Giants baseball games and there is one of those most days/evenings, I might get this woven in about 7-8 more hours or 2 1/2 games.

progress

Go Giants!

baseball-066